Curtain Fixing Dubai
Curtain fixing across Dubai by fitters who measure before they drill, bring the right anchor for the wall, and hang the track level the first time. The price is agreed per window before any hole is made.
Fixed per window
Quoted per window before we drill, and it holds.
Fixings included
Brackets, screws and wall plugs are in the price.
Seven days a week
Fitting slots seven days, evenings included.
Our own fitters
Our own fitters, carrying their own tools.
Curtain Fixing in Dubai, Measured Before We Drill
A curtain that hangs badly is almost never the curtain. It is a track fitted eight millimetres off level, a bracket screwed into gypsum with no anchor behind it, or a pole cut before anyone checked the recess. We measure the drop, the return and the stack width first, then fix to what the wall can actually hold.
Measured From The Fixing Line
Every window is measured from the fixing line down, not from the top of the frame. That is the measurement that decides whether your curtain kisses the floor or hovers two centimetres above it, and it is the one most often guessed.
Heavy Blackout And Wide Spans
Blackout linings and wide living-room spans are heavy. A three-metre track carrying lined blackout needs a centre bracket and the right fixing, or it bows within a month. We set the bracket count to the weight, not to what came in the box.
Tracks, Poles and Rails: What Goes Where
Track, pole or rail is not a style choice alone. It depends on whether you have a pelmet recess, how much ceiling sits above the window, and whether the wall behind is concrete, hollow block or gypsum board. We tell you which will work before you buy.

Ceiling Tracks And Pelmet Recesses
Ceiling-mounted tracks suit apartments with a shallow pelmet or a bulkhead above the window. They give a clean line and a full drop, and they need fixing into the slab rather than into the ceiling board.
Poles, Brackets And Wall Anchors
Poles carry their load on two end brackets and look better on a wide reveal. On plasterboard they need proper cavity anchors, and on hollow block a sleeve that expands behind the face, not a plastic plug that spins in the hole.
Curtain Fixing in Dubai Apartments
Towers across Marina, JLT, Business Bay and Downtown mostly want written permission before anyone drills, and several restrict the work to weekday hours. We file the form with your building, then fit inside the approved window. Dubai Marina and Business Bay are on our daily round.
Building Permission Filed First
Where the building wants a work permit or an insurance certificate before drilling starts, we submit it and confirm the slot in writing so security is expecting the fitter.
Measured At The Window, Not On Paper
Drop, width, return and stack are measured at the window rather than read off a floor plan. Handover drawings in new towers are frequently a centimetre or two out.
Nothing Pulled Out Of The Gypsum
Fixings go into the slab or into proper cavity anchors, so nothing pulls out of the gypsum six months later and nothing is deducted from your deposit at check-out.
Hung, Dressed And Vacuumed
Curtains are hung, dressed into even folds and left hanging properly, and the drill dust is vacuumed off the sill and the floor before we leave the room.
Blackout, Sheers and Blinds Fitted by Type
Blackout, sheer, roller, Roman and Venetian all hang differently and fail differently. A sheer sharing a track with a blackout needs a double rail with real clearance, or the two catch on each other every time you draw them.
Blackout That Actually Blocks Light
Blackout only blocks light if it covers the gap as well as the glass. We set the track wide enough and high enough that light does not leak around the edges, which is where most bedroom installations disappoint.
Double Tracks That Do Not Snag
Double tracks carry a sheer at the front and a blackout behind, separated enough that neither snags. The stack space either side is measured so the open curtain clears the glass instead of shading half of it.
Roller, Roman And Venetian Blinds
Roller, Roman and Venetian blinds are fitted inside the recess or face-fixed, depending on the depth you have. We check the recess is square first, because very few of them are.
What The Fitting Visit Covers
What You Never Have To Do
How a Curtain Fixing Visit Works
Four stages from your first message to a room with the curtains hanging, and the price is agreed before anyone opens a toolbox.
01
Measure Visit
A visit, or a few photos with rough dimensions, to confirm the window count, the wall type and what fixing each opening needs.
02
Fixed Price Per Window
One figure per window covering the fitter, the brackets, the fixings and the dressing. Nothing is added once the drill comes out.
03
Fitting Day
Floors are covered, the line is marked and checked with a level, holes are drilled on the mark, and the dust is caught as it is made.
04
Dressed, Tested And Cleared
Curtains hung, folds dressed, the mechanism drawn both ways to test it, and every offcut and screw packet taken away with us.
Same-Day and Weekend Curtain Fixing
Curtains usually arrive after the furniture, and nobody wants a week of bare windows in a ground-floor apartment. Same-day and next-day slots exist most weeks.
Same-Day Slots Most Weeks
Call in the morning and there is often a slot the same afternoon, particularly for one or two rooms. Whole-villa fits are booked a day or two ahead so the right fixings are on the van before the fitter sets off.
Why Dubai Households Call LoadUp
Our Own Fitters, Not Subcontractors
The fitter who arrives is on our payroll and does this every day, rather than a general handyman sent over by an agency.
The Quote Is The Invoice
The figure quoted per window is the figure invoiced. No call-out fee bolted on at the end, no charge for the extra bracket.
Insured, And We Make Good
The work is insured, and where a fixing marks a wall we make it good rather than pointing at the plaster.
Proper Fixings, Not The Ones Supplied
Brackets, plugs and screws come from our own stock and are chosen for your wall, not taken from the bag that came with the curtain.
Every Rail Levelled And Tested
Every rail is checked with a level after fixing, and every mechanism is drawn both ways before we pack up.
One Fitter, One Contact
The person who quotes the job is the person who fits it, so nothing is lost between the measure and the drill.
What Affects the Cost of Curtain Fixing in Dubai
Curtain fixing is priced per window, which makes the total easy to predict once four things are known.
How Many Windows
A single bedroom window and a full villa are different jobs. The price per window falls as the count rises, because the setup is done once.
Track Length And Drop Height
A three-metre track at a four-metre drop needs height access and a centre bracket. A standard bedroom window needs neither.
Single, Double Or Layered
A single track is quick. A double carrying sheer and blackout, or a track and a blind in the same recess, is more work on the same wall.
Wall Type And Anchor Needed
Concrete is straightforward. Gypsum, hollow block and aluminium each need a different anchor, and that changes the time spent on every window.
Curtain Fixing Dubai Price List
Indicative curtain fixing prices in Dubai. Your own figure is confirmed once we know the window count and the wall type, and it then stays fixed.
| Curtains / blinds | Workers | Price (AED) |
|---|---|---|
| 1 | 1 | 200-300 |
| 2 | 1 | 300-400 |
| 3 | 1-2 | 350-500 |
Prices cover the fitter, the brackets, the fixings and the dressing. Call 0561365702 or book a free measure visit and the written figure comes back the same day.
Questions About Curtain Fixing Dubai
How much does curtain fixing cost in Dubai?
Curtain fixing in Dubai is priced per window rather than by the hour, so the total is known before anyone drills. A single track starts around 200 AED and the rate per window falls as the count rises. Wall type, track length and whether you want a double rail all move the figure, which is why we confirm it after a quick measure.
Are brackets and fixings included?
Yes. Brackets, wall plugs, screws and cavity anchors sit inside the quoted price, chosen for your wall type rather than taken from the packet supplied with the curtain.
How soon can you fit my curtains?
Often the same day for one or two rooms. A full villa is usually booked a day or two ahead so the right anchors and track lengths are loaded before the fitter leaves.
Do you fit blinds and rails as well?
We fit tracks, poles, rails and blinds, and we can take down and rehang existing curtains during a move. If you also need shelves, mirrors or artwork put up, our picture hanging service covers that on the same visit.
What if the wall gets marked?
The work is insured. Where a fixing marks a wall, or a hole ends up in the wrong place, we fill and make good rather than leaving it for you to argue about at check-out.
Areas We Cover Across Dubai
Book Curtain Fixing in Dubai
Send the number of windows, rough sizes and a photo of the wall above one of them. A fixed price per window comes back the same day, with a fitting slot held for you.